Skip to main content

Washington Commanders

During the high-pressure NFL Draft, Gridd® and Gridd®
Mobile enable rapid draft room set-up.

During the high-pressure NFL Draft, the Washington Commanders rely on Gridd and Gridd Mobile to quickly set up their draft room in Washington, D.C.

FreeAxez recently followed up with one of the Gridd Mobile customers, the Washington Commanders—one of the most recognized teams in the NFL. As any football fan knows, the NFL Draft is a major event each year, when scouts and executives gather to make decisions that shape the future of their franchise. For the Commanders, that means assembling key personnel from all over the country in their Washington, D.C. draft room for a high-stakes, one-day operation.

The Challenge: One Day for a High-Stakes Setup

The facility mangers needed to transform their layout into a high-tech “war room” equipped with power, data, phones, and computers in just one day.

These draft rooms—seen on TV by millions—are full of technology: computers, phones, and workstations set up just for that occasion. Fans watching at home see these “war rooms” go from empty. meticulously arranged spaces to buzzing hubs of decision-making when the draft goes live. But what they don’t see is the complex infrastructure behind it—the power, data, and setup work that must happen quickly and precisely

The Solution: Gridd + Gridd Mobile

Gridd’s flexibility allows for last-minute adjustments. The night before the draft, a team leader used Gridd Mobile’s augmented reality capabilities to guarantee the workplace was fully operational by morning.

That’s where Gridd and Gridd Power come in. Because the set-up is temporary. it involves a lot of last-minute moves, adds, and changes. The Commanders rely on Gridd to make sure everything is in place and functioning perfectly, just in time for the big day.

In a recent call, one of their team leads shared how helpful Gridd Mobile was. The day before the draft, he needed to located several specific floor boxes to ensure every executive and scout had power and data at their stations. Using Gridd Mobile, he was able to find what he needed fast, make the necessary changes, and get the space ready without a hitch. When the team walked in the next day, everything was perfectly set up.

Why It Matters: A Case Study Everyone Can Visualize

Millions watch the NFL Draft. This familiar, high-stakes scenario shows how Gridd and Gridd Mobile ensures flawless execution under pressure.

What makes this story stand out is how relatable it is. For many people, it’s hard to picture what a technical change at a company like Walmart or LinkedIn really looks like. But almost everyone has watched the NFL Draft, seen those rooms, and understands the pressure behind them. This is a real, tangible example of how Gridd, Gridd Power, and Gridd Mobile help deliver seamless operations—even on one of the most high-profile days in sports.

Clients

FreeAxez Client - Walmart Corporate Logo
FreeAxez Client - SAP Logo

Testimonials

For over 25 years, FreeAxez’ goal has been supporting our clients through every step of their projects as an advisor,
not just as a product vendor. The relationship never ends at purchase.

Mike Schmidt

“FreeAxez really has a fantastic product. The installing contractor said this was the easiest raised floor he has ever installed. It took me no more than 2 hours to relocate 8-floor boxes with your system, that was awesome.”

Technical Trainer, Walmart Support Team
Timothy Van Loo

“I am very satisfied with the ease of installation, the ability to reconfigure, run data, phone, and power. Without the availability of [The Gridd system], the project would have required the removal of concrete flooring to install conduit for the phone, data, and electrical needs. I would definitely consider the FreeAxez [Gridd system] on the next project.”

Facilities Manager
Stan Jones

“Our first objective was to install a robust raised floor system that would allow the greatest amount of flexibility on console placement within the Control Room. This required multiple, easy-access cable routing capabilities without being offensive to the overall look of the workspace. The FreeAxez floor system met all objectives. ”

Power Plant Superintendent
Dave Miller

“The school system has tried to create an environment that replicates a real world production studio with technology and products that are used everyday in the television industry. FreeAxez flooring has been a major part of the equation. Thank you for a great product.”

Facilities Manager
Dawn Tinsman
“Several years ago, after an exhaustive and careful evaluation of numerous technologies and manufacturers, we selected FreeAxez to provide our flooring system. I would, without hesitation select the FreeAxez system again for any future needs.”
Administrative Project Assistant
    See what The Gridd® Systemcan do for you.
    Why Gridd